Add a one-line comment at the top of Omni/Pipeline/DESIGN.md: <!-- Status: All subtasks (t-603.1-t-603.8) complete. Tested end-to-end. -->
This is the only change needed. Do not modify any other files.
Pipeline: dev completed (run=dev-t-633-1771434243, cost=0.0c)
Pipeline: verification skipped (No namespace set, skipping build verification), promoting
Pipeline: integrated into live at 68526d4ce29200ae69ca759e1272faca8220e55a
namespace: Omni/Pipeline.hs